Date/Time:
4/20/23
All Day
Location:
Western Washington Operating Engineers,
Bothell, WA
Your ADSC-WSDOT Task Force Committee invites you to the Annual Joint Training Workshop. Our goal is to develop a common understanding between designers, specifiers, constructors and inspectors in the design and construction of drilled shaft and anchored earth retention systems. The purpose of these workshops is to bring together WSDOT and Specialty Geotechnical Construction Industry personnel in a workshop forum for open communication and cooperation.
We are finding widespread use of the WSDOT Drilled Shaft and Earth Retention Specifications by other Public Agencies. We are inviting other agencies and consulting engineers to participate in this Workshop. This year’s workshop will focus on the following topics:
- Drilled Shaft Design, Construction, Base Grouting & Testing
- Anchored Earth Retention Testing
- Drilled Shaft & Anchored Earth Retention Case Studies
From these seminars we develop implementation plans to address the identified areas in need of attention so that we can provide the end users economical & technically feasible Drilled Shaft foundation and Anchored Earth Retention systems.
As of 4/11/2023, Registration is closed for this event, on-site registration will be available for $55 per person.
Download the Presentations:
WSDOT Geotechnical and Construction Practice (Mark Frye & Jim Cuthbertson)
Drilled Shaft Equipment & Excavation (Adam Running, MDCI)
Drilled Shaft Rebar / Concrete Placement (Brendan Harkins, CJA)
Non-destructive Testing (Mark Rohrbach, RAM Geoservices)
Slurry & Disposal (John Tuttle, Sinclair)
Tieback Testing (Peter Mercer, CJA)
Bi-Directional Testing (Marty Bixler, GRL)
Case Study – SR520 to Mercer (Chase Chappelle, MC)
Case Study – May Creek (Griffin Lowe, CJA)
Case Study – Abernathy Bridge (Tait McCutchan, MDCI)
Case Study – Washington Convention Center (Bryce Niekamp, DBM)
Event Registration
Bookings are closed for this event.